Ikoku Flyover.... 100% done and ready for commissioning.

Ikoku Flyover was awarded less than 10 months ago with a completion period of 14 months.

The Flyover was completed well ahead of its scheduled completion period.

(Also known as Nkpolu Oroworukwo flyover
📷: PHdrones

image