Ikoku Flyover.... 100% done and ready for commissioning. 
 
Ikoku Flyover was awarded less than 10 months ago with a completion period of 14 months. 
 
The Flyover was completed well ahead of its scheduled completion period. 
 
(Also known as Nkpolu Oroworukwo flyover 
📷: PHdrones